Kitchen Floor Tile Installation Day!!

Floor Tiles
It's finally here, the day the tile goes down on the kitchen floor!

Accent Tiles
I moved the 48 boxes from the garage to the front entrance yesterday afternoon. These tile boxes have been stored for 4 to 5 years waiting for me to finally decide on what to do with the kitchen.  I am an optimist and never give up on my dreams.  I knew one day I would have this tile in my kitchen, bath, entry, hall and laundry room.  I think when this is all in I will have accomplished the look I was hoping for.


We cleared out the kitchen last night, moving the china hutch, dining table, rolling island, stove and refrigerator.  

The stove and kitchen table moved to the living room.
Refrigerator moved into the entrance so I could keep it plugged in, the island was moved into the dining room with the microwave oven and the hutch is sitting in the hall.  Looks like we will be dining out for a couple of days. 

The crew of two arrived around 9:00 AM and got started right away.  You can see here where he is joining the new tile to the existing tile in the entrance and hall. The accent tiles are shown here in the entrance.  He will use the remaining 24 accent tiles around the perimeter of the kitchen.

This photo shows a better color of the cabinets in the natural light. The others seem to make them a darker green, but they are this light, sage green color. I love the color!!
It won't be long now! The tile will be completed by the weekend. By the end of the month I should have the granite counter top in and my kitchen ready for some serious cooking!

Monday, November 19, 2012

All Smiles Today!



I am so happy with the way my kitchen is turning out!

I finished all the painting last week, and Tony helped me Saturday and Sunday putting all the doors and all the hardware on the cabinets.


It took a long time because the paint added a bit more thickness to the edges of the doors which caused the existing holes for the hinges to be a bit off on a couple of the doors.  Also I never noticed before when they were wood that they didn't all line up perfectly! It showed up when they were painted, all in all I am very pleased with the results.


We ended up choosing black hardware over the brushed nickel.  When I tried the hinges on the nickel, they didn't line up on most of the doors.  Not sure why because the style was the same as the black.  Things work out for the best and now that the black is on all the cabinets, I like it better than the nickel anyway.


We still have to patch the walls from the electrical work, affix the cabinet to the wall before the counter top and new sink goes in.  I also am thinking about painting the island cart the same color as the cabinets. 


We still are looking at samples for the counter top.  Tony likes the granite called Typhoon Bordeaux. The sample looks nothing like the slab we saw at Arizona Tile, but then the variation in the grain and color is different in each slab. The one we looked at had a lot of the sage green color and was much lighter than this small sample.  The brown tile in the photo is what will go on the floor and the small tiles are for the back of the stove area and under that cabinet.




So far my costs have only been for the paint; 1 gallon of Behr Semi-Gloss color is Bonsai Pot. The color will not come up on their website, but they have the swatch in Home Depot.  Then 1 gallon of Kiln primer.  I have 1/2 gallon of each left!  Cost for the paint was $39.98 and the primer was around $20.00.  The hardware (hinges and handles) came in around $140.00.  

Of course the counter top and tile installation will be $1500.00 - $2200.00.  I still need to buy the stainless steel sink, but I think I will come in close to my budget of $2500.00 for the whole project.  

Below are some before photos: